installation and inspection of the temporary meter box
energy retailer/ power organised via Temporary Power 4 U – additional charges apply
final inspection
meter relocation to permanent meter
compliance testing as required by standards
removal on completion
installation of the temporary meter box to a boundary box
apply for a final connection (Final Inspection charge additional)
Option B includes:
hire of the temporary meter box
installation of the temporary meter box
inspection of the temporary meter box
power is to be organised by Temporary Power 4 U using the clients selected energy retailer & account details provided
compliance testing as required by standards
removal on completion
installation of the temporary meter box to a boundary box
apply for a final connection (Final Inspection charge additional)
Option C:
customized for you – email or phone to organise
can include installation of service mains /water/phone & enable
Option D:
hire the temporary meter box
installation & removal of the temporary meter box
all inspection & applications to be done by Electrician/ client
Charges are based on being in the Christchurch area. All hire options are based on a 6 month period with weekly charge after that. Power to come via a boundary box. Energy charges come from the energy retailer & may be subject to change